
Office Buildout
From startup spaces to corporate offices, we provide complete electrical services for new office buildouts and tenant improvements.
About office buildoutCommercial transformer installation gives a building the voltage its equipment and panels actually need, such as stepping 600V down to 120/208V for lighting, receptacles and office loads. City Power sizes, installs and connects dry-type transformers for businesses across Toronto and the GTA.

Many commercial and industrial units in the GTA are supplied at 600V three phase. That suits motors, rooftop units and large equipment, but lighting, receptacles, computers and most plug-in equipment need 120/208V. A step-down transformer makes that second voltage, and the panel it feeds becomes the heart of the tenant space.
We start with the load. The connected lighting, receptacle, kitchen, office and equipment loads are added up, growth is allowed for, and the transformer is sized in kVA to carry it without running hot. An undersized transformer hums, overheats and trips. A badly oversized one costs more to buy and wastes energy every hour it is energized.
Then we look at where it will live. A dry-type transformer needs ventilation space around it, a surface or platform that can carry its weight, and working room in front of the equipment beside it. In a tight electrical room that often decides the mounting method.
A typical installation includes:
The usual triggers are a new tenant fit-out, a unit being divided, added office or retail space inside a warehouse, new equipment that needs a different voltage, or an old transformer that has started to overheat, buzz loudly or trip its protection.
Imported or US-specification machines are another common case. Equipment built for 480V will not run correctly on a 600V supply, so it needs its own transformer and disconnect. We read the nameplate first so the voltage, kVA and protection match what the manufacturer requires. That work often runs alongside three phase electrical installation and a disconnect switch at the machine.
If the problem is an existing transformer that runs hot or a panel with low or unbalanced voltage, we find the cause before recommending a replacement. Loose terminations, overloaded phases and blocked ventilation can all look like a failed transformer. That diagnosis is part of commercial electrical troubleshooting.
Connecting a transformer means working on the building's distribution, so the power to that section has to be off. We plan the shutdown with the owner or property manager, and for occupied buildings we can schedule it outside business hours so tenants are not left without power in the middle of the day.
Transformer work must follow the Ontario Electrical Safety Code. City Power is a Licensed Electrical Contractor, ECRA/ESA #7015314. Where the work needs an ESA notification, we file it, complete the installation and have it inspected. The inspector looks at conductor sizing, overcurrent protection on both sides, grounding and bonding, clearances, mounting and labelling.
Transformer installation is quoted in writing after a site visit or a look at photos of the equipment, the panel and the route between them. The price depends on the kVA size, the voltages, how far the transformer sits from the supply and from the panel it feeds, the mounting method, whether a new panel is part of the job, and whether the shutdown has to happen after hours.
City Power serves Toronto and the GTA from our North York office at Sheppard and Don Mills. We install transformers in industrial units, warehouses, plazas, restaurants, offices and mixed-use buildings.
The size comes from the load it will feed. We add up the connected lighting, receptacle and equipment loads, allow for growth, and choose a kVA rating that carries it without running hot. Common sizes for tenant spaces run from 15 kVA to 112.5 kVA, but the calculation for your unit decides it, not a rule of thumb.
Many commercial and industrial buildings in Ontario are supplied at 600V three phase because it suits motors and large equipment. Lighting, receptacles and office equipment need 120/208V, so a step-down transformer is installed to create that voltage and feed a separate panel.
Yes. We first check whether the transformer itself has failed or whether the cause is an overload, a loose termination, unbalanced phases or blocked ventilation. If it needs replacing, we size the new unit for the present load, plan the shutdown and install it with the correct protection on both sides.
Transformer installation is electrical work under the Ontario Electrical Safety Code. Where an ESA notification is required, City Power files it and arranges the inspection. The inspector reviews conductor sizes, overcurrent protection, grounding and bonding, clearances and labelling before the work is accepted.
Free estimates on all projects. Same-day service available across the GTA. Send the details and a licensed electrician replies the same day.
Or call 416-837-4038Free written quote
Tell us about the job and we reply the same day. For an emergency, call 416-837-4038 instead.
A licensed electrician answers every call, day or night.