Office Buildout
From startup spaces to corporate offices, we provide complete electrical services for new office buildouts and tenant improvements.
About office buildoutThree phase electrical installation gives commercial and industrial spaces the power needed for machinery, HVAC, compressors, production equipment and larger distribution systems. City Power plans, installs and coordinates three-phase work for businesses across Toronto and the GTA.

A proper three phase electrical installation begins with the nameplate, the site distribution and the way the equipment will actually run. A 3-phase feed for a CNC machine, compressor, rooftop HVAC unit, production line or pump is not just “more power.” It needs the correct voltage, breaker size, conductor type, disconnect, grounding and bonding, and space in the electrical room to work safely.
We review the equipment data first: voltage, full-load amps, starting current, recommended fuse or breaker size, required disconnecting means, and whether the manufacturer calls for a neutral. Motors and compressors can have high inrush current, so the circuit has to be planned so it starts reliably without nuisance tripping or dimming the rest of the space.
The distribution side matters just as much. We look at the existing service, switchgear, splitter, transformer, panelboards and spare capacity. In many GTA shops, the original service was designed for lighting and receptacles, then later asked to support lifts, compressors, packaging equipment, rooftop units, welders or chargers. That is where load planning prevents expensive rework.
Typical three-phase scope can include:
For larger industrial or storage spaces, we may coordinate this work as part of a broader warehouse electrical plan so lighting, equipment, loading areas and future expansion are not treated as separate problems.
You usually need three-phase power when the equipment nameplate calls for it, when the motor load is too large for practical single-phase wiring, or when a facility is adding production capacity. Common examples include compressors, commercial HVAC units, pumps, woodworking equipment, metalworking machines, lifts, packaging machines, commercial laundry equipment and process equipment.
Three-phase is also common when a building is being reorganized. A tenant may move into a unit with an existing 3-phase service, but the panels are in the wrong area. A machine may need to be moved from one side of the shop to another. A landlord may want cleaner distribution before leasing a bay to a heavier user. In those cases, the work is often less about “adding power” and more about getting the right power to the right place.
Important planning questions include:
If the issue is an existing 3-phase circuit that trips, overheats, loses a phase or fails to start equipment, that may be a troubleshooting job before it is an installation job. We can separate repair from upgrade planning through electrical repair and troubleshooting when the failure point is not yet clear.
Three-phase electrical work must follow the Ontario Electrical Safety Code. Where required, City Power files the ESA notification, completes the installation, and has the work inspected. We are a Licensed Electrical Contractor, ECRA/ESA #7015314, and every job is permitted with the ESA where required.
The ESA inspection is not a formality. For three-phase work, inspectors can look at conductor sizing, overcurrent protection, grounding and bonding, panel and disconnect labelling, working clearances, enclosure ratings, support of raceways and cables, and whether the installation matches the submitted scope. If equipment is outdoors, in a wet area, near vehicles, or in a dusty or production environment, the location affects material choices.
Service capacity changes add another layer. If the existing utility service is not large enough, or if the building needs a service upgrade, the local utility may need to review the load, metering, service entrance, transformer capacity and outage timing. Depending on the address, that may involve Toronto Hydro, Alectra, Hydro One, Elexicon, Oshawa Power, Oakville Hydro or Burlington Hydro.
Utility coordination can affect schedule. Some work can be completed from existing distribution with a short planned shutdown. Other work requires utility approval before equipment is ordered or before a service disconnect can be scheduled. We tell you which path applies after reviewing the site, because guessing at available capacity is how projects stall.
If your business also needs formal documentation after completed work, an ESA Electrical Safety Certificate page explains how ESA documentation fits into insurance, leasing and sale requirements.
A three-phase site visit is practical. We inspect the electrical room, panel labels, available breaker spaces, service size, equipment location, ceiling or wall access, conduit routes, shutdown limitations and the nameplate on the equipment. If drawings, equipment cut sheets or landlord requirements are available, we review them before quoting.
For an operating business, scheduling matters. We ask when the equipment can be offline, whether the main service can be shut down, who needs notice, and whether production, refrigeration, security systems or life-safety equipment will be affected. Some installations can be roughed in during business hours and tied in during a planned shutdown. Others need after-hours work to avoid interrupting staff or tenants.
A typical process looks like this:
Three phase electrical installation is quoted in writing after a site visit. The cost depends on service capacity, distance from the panel, conductor size, conduit path, shutdown requirements, distribution equipment, utility involvement and whether the work is part of a larger facility upgrade. We do not guess at this work over the phone because the same machine can be a simple nearby circuit in one building and a service-capacity project in another.
If three-phase power is part of a larger commercial plan, we can also coordinate related commercial electrical services or power for fleet EV charger installation where vehicle charging will affect the building load. The goal is the same: install the capacity you need now without boxing in the next piece of equipment.
Check the equipment nameplate or manufacturer cut sheet. It will list voltage, phase, full-load amps and overcurrent requirements. If it says 3-phase, the equipment should not be connected to a single-phase circuit. During the site visit, we confirm the available building voltage and whether the existing panels can supply the load safely.
Sometimes, but it depends on the building and utility supply. If three-phase service is available in the building or at the utility, the project may involve service, metering and distribution changes. If it is not available, alternatives must be reviewed carefully. We confirm the existing service first, then quote the viable path in writing.
Where required, yes. New three-phase circuits, panels, distribution changes and service-capacity work generally require an ESA notification and inspection. City Power files ESA notifications where required, installs to the Ontario Electrical Safety Code, and coordinates inspection so you have proper documentation for the work.
Often part of the work can be prepared while the business is operating, such as routing conduit or mounting equipment. Final connection to live distribution usually requires a planned shutdown for safety. We review operating hours, critical loads and tenant needs during the site visit so the quote includes a realistic shutdown plan.
Free estimates on all projects. Same-day service available across the GTA. Send the details and a licensed electrician replies the same day.
Or call 416-837-4038Free written quote
Tell us about the job and we reply the same day. For an emergency, call 416-837-4038 instead.
A licensed electrician answers every call, day or night.